Ciri-ciri batuan reservoir : analisis teras /
Saved in:
| Main Author: | |
|---|---|
| Format: | Book |
| Language: | Malay |
| Published: |
Kuala Lumpur :
Dewan Bahasa dan Pustaka,
1993.
|
| Subjects: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| LEADER | 01437nam a2200289 4500 | ||
|---|---|---|---|
| 001 | vtls000167765 | ||
| 003 | UPM | ||
| 005 | 20161023173056.0 | ||
| 008 | 931012 1993 my a 00 may | ||
| 020 | |a 9836232184 (pbk.) | ||
| 035 | |a 9836232184 | ||
| 039 | 9 | |a 200804181206 |b VLOAD |y 200110271202 |z load0004 | |
| 040 | |c UPM | ||
| 090 | 0 | 0 | |a TA706.3 M7445 |
| 100 | 1 | |a Monicard, Robert P. | |
| 245 | 1 | 0 | |a Ciri-ciri batuan reservoir : |b analisis teras / |c Robert P. Monicard ; Penterjemah Badrul Hisam Ismail. |
| 260 | |a Kuala Lumpur : |b Dewan Bahasa dan Pustaka, |c 1993. | ||
| 300 | |a 156p. : |b ill. ; |c 24cm. | ||
| 650 | 0 | |a Drill core analysis. | |
| 650 | 0 | |a Oil reservoir engineering. | |
| 942 | |2 lcc |c 30000 | ||
| 999 | |c 477997 |d 477997 | ||
| 952 | |0 0 |1 0 |4 0 |6 TA07063 M7445 |7 0 |9 653429 |a 30000 |b 30000 |c 30000 |d 2016-10-23 |o TA706.3 M7445 |p 1000310087 |r 2016-10-23 |t 1 |w 2016-10-23 |y 30000 | ||
| 952 | |0 0 |1 0 |4 0 |6 TA07063 M7445 |7 0 |9 653432 |a 10000 |b 10000 |c 10000 |d 2016-10-23 |o TA706.3 M7445 |p 1000349393 |r 2016-10-23 |t 1 |w 2016-10-23 |y 10000 | ||
| 952 | |0 0 |1 0 |4 0 |6 TA07063 M7445 |7 0 |9 653435 |a 10000 |b 10000 |c 10000 |d 2016-10-23 |o TA706.3 M7445 |p 1000349394 |r 2016-10-23 |t 1 |w 2016-10-23 |y 10000 | ||
| 952 | |0 0 |1 0 |4 0 |6 TA07063 M7445 |7 0 |9 653438 |a 30000 |b 30000 |c 30000 |d 2016-10-23 |o TA706.3 M7445 |p 1000282485 |r 2016-10-23 |t 1 |w 2016-10-23 |y 30000 | ||
| 952 | |0 0 |1 0 |4 0 |6 TA07063 M7445 |7 0 |9 653441 |a 10000 |b 10000 |c 10000 |d 2016-10-23 |o TA706.3 M7445 |p 1000349395 |r 2016-10-23 |t 1 |w 2016-10-23 |y 10000 | ||



