Ciri-ciri batuan reservoir : analisis teras /

Saved in:
Bibliographic Details
Main Author: Monicard, Robert P.
Format: Book
Language:Malay
Published: Kuala Lumpur : Dewan Bahasa dan Pustaka, 1993.
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01437nam a2200289 4500
001 vtls000167765
003 UPM
005 20161023173056.0
008 931012 1993 my a 00 may
020 |a 9836232184 (pbk.) 
035 |a 9836232184 
039 9 |a 200804181206  |b VLOAD  |y 200110271202  |z load0004 
040 |c UPM 
090 0 0 |a TA706.3 M7445 
100 1 |a Monicard, Robert P. 
245 1 0 |a Ciri-ciri batuan reservoir :  |b analisis teras /  |c Robert P. Monicard ; Penterjemah Badrul Hisam Ismail. 
260 |a Kuala Lumpur :  |b Dewan Bahasa dan Pustaka,  |c 1993. 
300 |a 156p. :  |b ill. ;  |c 24cm. 
650 0 |a Drill core analysis. 
650 0 |a Oil reservoir engineering. 
942 |2 lcc  |c 30000 
999 |c 477997  |d 477997 
952 |0 0  |1 0  |4 0  |6 TA07063 M7445  |7 0  |9 653429  |a 30000  |b 30000  |c 30000  |d 2016-10-23  |o TA706.3 M7445  |p 1000310087  |r 2016-10-23  |t 1  |w 2016-10-23  |y 30000 
952 |0 0  |1 0  |4 0  |6 TA07063 M7445  |7 0  |9 653432  |a 10000  |b 10000  |c 10000  |d 2016-10-23  |o TA706.3 M7445  |p 1000349393  |r 2016-10-23  |t 1  |w 2016-10-23  |y 10000 
952 |0 0  |1 0  |4 0  |6 TA07063 M7445  |7 0  |9 653435  |a 10000  |b 10000  |c 10000  |d 2016-10-23  |o TA706.3 M7445  |p 1000349394  |r 2016-10-23  |t 1  |w 2016-10-23  |y 10000 
952 |0 0  |1 0  |4 0  |6 TA07063 M7445  |7 0  |9 653438  |a 30000  |b 30000  |c 30000  |d 2016-10-23  |o TA706.3 M7445  |p 1000282485  |r 2016-10-23  |t 1  |w 2016-10-23  |y 30000 
952 |0 0  |1 0  |4 0  |6 TA07063 M7445  |7 0  |9 653441  |a 10000  |b 10000  |c 10000  |d 2016-10-23  |o TA706.3 M7445  |p 1000349395  |r 2016-10-23  |t 1  |w 2016-10-23  |y 10000