Industrialized construction chronology: the disputes and success factors for a resilient construction industry in Malaysia

Background: The construction industry needs to be resilient in Malaysian economy because it contributes significantly to its socio-economy, gross domestic production, and positive employment ratios. Objective: This study is a chronological review of the fundamental issues related to the industrializ...

Celý popis

Uloženo v:
Podrobná bibliografie
Hlavní autoři: Rashid, Ali, Ibrahim, Rahinah
Médium: Článek
Jazyk:English
Vydáno: Bentham Open 2017
On-line přístup:http://psasir.upm.edu.my/id/eprint/62152/1/Industrialized%20construction%20chronology.pdf
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo otaguje tento záznam!