How to develop, install, and maintain a cost reduction/productivity improvement program /

Saved in:
Bibliographic Details
Main Author: Behan, Raymond J.
Format: Book
Language:English
Published: New York: Van Nostrand Reinhold, c1983
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 00897nam a2200253 x 4500
001 vtls000082879
003 UPM
005 20161023052945.0
008 100129s1986 nyua w 0011k enghf
020 |a 0442212801 
039 9 |a 201001292238  |b VLOAD  |c 200804190726  |d VLOAD  |c 200412202137  |d VLOAD  |y 200110271040  |z load 
040 |c UPM 
090 0 0 |a HD47.3  |b B491 
100 1 |a Behan, Raymond J. 
245 1 0 |a How to develop, install, and maintain a cost reduction/productivity improvement program /  |c Raymond J. Behan 
260 |a New York:  |b Van Nostrand Reinhold,  |c c1983 
300 |a 205p.:  |b ill.;  |c 24cm 
350 0 0 |a CIP entry 
650 0 |a Cost control. 
650 0 |a Industrial productivity. 
942 |2 lcc  |c 10000 
950 0 0 |a 000419924 
999 |c 399983  |d 399983 
952 |0 0  |1 0  |4 0  |6 HD00473 B491  |7 0  |9 520225  |a 10000  |b 10000  |c 10000  |d 2016-10-23  |o HD47.3 B491  |p 1000018908  |r 2016-10-23  |t 1  |w 2016-10-23  |y 10000