An improved leader particle swarm optimisation algorithm for solving flexible ac transmission systems optimisation problem in power system
Line outage contingencies in power systems are likely to result in overloads in branches, voltage deviations in buses and excessive power losses. The most common approach for alleviating such consequences is using flexible AC transmission systems (FACTS) devices. Since overloads are the main concern...
Bewaard in:
Hoofdauteur: | Jordehi, Ahmad Rezaee |
---|---|
Formaat: | Thesis |
Taal: | English |
Gepubliceerd in: |
2014
|
Online toegang: | http://ethesis.upm.edu.my/id/eprint/8155/1/FK%202014%2058.pdf |
Tags: |
Voeg label toe
Geen labels, Wees de eerste die dit record labelt!
|
Gelijkaardige items
-
An improved leader particle swarm optimisation algorithm for solving flexible ac transmission systems optimisation problem in power system
door: Jordehi, Ahmad Rezaee
Gepubliceerd in: (2014) -
An improved leader particle swarm optimisation algorithm for solving flexible ac transmission systems optimisation problem in power system /
door: Jordehi, Ahmad Rezaee. -
Parameter selection in particle swarm optimisation: a survey
door: Rezaee Jordehi, Ahmad Rezaee, et al.
Gepubliceerd in: (2013) -
Particle swarm optimisation applications in FACTS optimisation problem
door: Jordehi, Ahmad Rezaee, et al.
Gepubliceerd in: (2013) -
Flexible AC Transmission Systems: Modelling and Control
door: Zhang, Xiao-Ping., et al.
Gepubliceerd in: (2006)