An improved leader particle swarm optimisation algorithm for solving flexible ac transmission systems optimisation problem in power system
Line outage contingencies in power systems are likely to result in overloads in branches, voltage deviations in buses and excessive power losses. The most common approach for alleviating such consequences is using flexible AC transmission systems (FACTS) devices. Since overloads are the main concern...
Uloženo v:
| Hlavní autor: | Jordehi, Ahmad Rezaee |
|---|---|
| Médium: | Diplomová práce |
| Jazyk: | English |
| Vydáno: |
2014
|
| On-line přístup: | http://ethesis.upm.edu.my/id/eprint/8155/1/FK%202014%2058.pdf |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo otaguje tento záznam!
|
Podobné jednotky
-
An improved leader particle swarm optimisation algorithm for solving flexible ac transmission systems optimisation problem in power system
Autor: Jordehi, Ahmad Rezaee
Vydáno: (2014) -
An improved leader particle swarm optimisation algorithm for solving flexible ac transmission systems optimisation problem in power system /
Autor: Jordehi, Ahmad Rezaee. -
Parameter selection in particle swarm optimisation: a survey
Autor: Rezaee Jordehi, Ahmad Rezaee, a další
Vydáno: (2013) -
Particle swarm optimisation applications in FACTS optimisation problem
Autor: Jordehi, Ahmad Rezaee, a další
Vydáno: (2013) -
Flexible AC Transmission Systems: Modelling and Control
Autor: Zhang, Xiao-Ping., a další
Vydáno: (2006)
