An improved leader particle swarm optimisation algorithm for solving flexible ac transmission systems optimisation problem in power system
Line outage contingencies in power systems are likely to result in overloads in branches, voltage deviations in buses and excessive power losses. The most common approach for alleviating such consequences is using flexible AC transmission systems (FACTS) devices. Since overloads are the main concern...
Wedi'i Gadw mewn:
| Prif Awdur: | Jordehi, Ahmad Rezaee |
|---|---|
| Fformat: | Thesis |
| Iaith: | English |
| Cyhoeddwyd: |
2014
|
| Mynediad Ar-lein: | http://ethesis.upm.edu.my/id/eprint/8155/1/FK%202014%2058.pdf |
| Tagiau: |
Ychwanegu Tag
Dim Tagiau, Byddwch y cyntaf i dagio'r cofnod hwn!
|
Eitemau Tebyg
-
An improved leader particle swarm optimisation algorithm for solving flexible ac transmission systems optimisation problem in power system
gan: Jordehi, Ahmad Rezaee
Cyhoeddwyd: (2014) -
An improved leader particle swarm optimisation algorithm for solving flexible ac transmission systems optimisation problem in power system /
gan: Jordehi, Ahmad Rezaee. -
Parameter selection in particle swarm optimisation: a survey
gan: Rezaee Jordehi, Ahmad Rezaee, et al.
Cyhoeddwyd: (2013) -
Particle swarm optimisation applications in FACTS optimisation problem
gan: Jordehi, Ahmad Rezaee, et al.
Cyhoeddwyd: (2013) -
Flexible AC Transmission Systems: Modelling and Control
gan: Zhang, Xiao-Ping., et al.
Cyhoeddwyd: (2006)
