An improved leader particle swarm optimisation algorithm for solving flexible ac transmission systems optimisation problem in power system
Line outage contingencies in power systems are likely to result in overloads in branches, voltage deviations in buses and excessive power losses. The most common approach for alleviating such consequences is using flexible AC transmission systems (FACTS) devices. Since overloads are the main concern...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Abschlussarbeit |
Sprache: | English |
Veröffentlicht: |
2014
|
Online Zugang: | http://ethesis.upm.edu.my/id/eprint/8155/1/FK%202014%2058.pdf |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!