An improved leader particle swarm optimisation algorithm for solving flexible ac transmission systems optimisation problem in power system
Line outage contingencies in power systems are likely to result in overloads in branches, voltage deviations in buses and excessive power losses. The most common approach for alleviating such consequences is using flexible AC transmission systems (FACTS) devices. Since overloads are the main concern...
Saved in:
Príomhúdar: | |
---|---|
Formáid: | Thesis |
Teanga: | English |
Foilsithe: |
2014
|
Rochtain Ar Líne: | http://ethesis.upm.edu.my/id/eprint/8155/1/FK%202014%2058.pdf |
Clibeanna: |
Cuir Clib Leis
Gan Chlibeanna, Bí ar an gcéad duine leis an taifead seo a chlibeáil!
|
Bí ar an gcéad duine le tuairim a scríobh!