An improved leader particle swarm optimisation algorithm for solving flexible ac transmission systems optimisation problem in power system

Line outage contingencies in power systems are likely to result in overloads in branches, voltage deviations in buses and excessive power losses. The most common approach for alleviating such consequences is using flexible AC transmission systems (FACTS) devices. Since overloads are the main concern...

Täydet tiedot

Tallennettuna:
Bibliografiset tiedot
Päätekijä: Jordehi, Ahmad Rezaee
Aineistotyyppi: Opinnäyte
Kieli:English
Julkaistu: 2014
Linkit:http://ethesis.upm.edu.my/id/eprint/8155/1/FK%202014%2058.pdf
Tagit: Lisää tagi
Ei tageja, Lisää ensimmäinen tagi!